Unlock a world of possibilities! Login now and discover the exclusive benefits awaiting you.
Hallo,
i would like to greate an Diagramm with too values in one scantling.
One value are a Date for example 31.07.2016 04.04.25 and second are value are 00.00.35.
The scantling must be exist as too color red and green and the summe of the scantling are 31.07.2016 04.05.00.
Have any one a idea?
Could you post a sample of what you required
The red area are the value 00:00:35 and the green area are the timestamp.
The value 00:00:35 is a separat column in the database and the timestamp (31.07.2016 04.04.25) is a other column in database.
Okay i have found the functionen.