Hi everyone
Is there a way to schedule a reload only in between 2 hours? (for example only from 7.00 to 23.00)
i see this option is available on normal scheduling, but if i need to start the reload after the success of another task, how can i put these 2 rules togheter??
(the first task reloads every 15 minutes and it must not have any limitation)
so the task must start if:
1)task n.°1 succeded
AND
2)time is between 7.00 and 23.00
thank you in advance
Maybe you could do it similar to as described here: