Unlock a world of possibilities! Login now and discover the exclusive benefits awaiting you.
Hi,
Is it possible to have planned line in the Bar chart.
For example consider the below example
Suppose there is a BAR chart for SLA Calculation. I would like to have a line drawn at 80% which will indicate that is minimum SLA level to be maintained.
Regards,XXX
Under the Presentation tab, there are Reference Lines. Click Add, give it a label of Minimum (or whatever). If you are using percents, Percentile may be available, otherwise use the straight expression.
Under the Presentation tab, there are Reference Lines. Click Add, give it a label of Minimum (or whatever). If you are using percents, Percentile may be available, otherwise use the straight expression.