Hi,

Is it possible to have planned line in the Bar chart.

For example consider the below example

Suppose there is a BAR chart for SLA Calculation. I would like to have a line drawn at 80% which will indicate that is minimum SLA level to be maintained.

Regards,XXX

1 Solution

Accepted Solutions
Not applicable
Author

Under the Presentation tab, there are Reference Lines. Click Add, give it a label of Minimum (or whatever). If you are using percents, Percentile may be available, otherwise use the straight expression.