Hi Guys, I need to calculate days in a column of dates for example :-
10/01/2012
31/03/2012
05/04/2012 etc.
The problem I have is that in the QVD I load, all the dates in the same column have the same field name. How do I calculate the number of days between the two different dates in this instance.
Paul.