Hi,
I have the following 2 calendar dates ranges. One is the planned schedule date ranges for individual and the other is the leave date range taken by individual. I need to know how to design this so I can have a count of number of available people in a schedule date.
I had combine these 2 dates range under one table. the dates ranges is under the columns - Duration Start, Duration End. Highlight in yellow is the leave of absence.
How should I design this so I can meet my objective?
Example.
Thanks
Chun Wey