I need to include a date parameter and an additional calculation within my existing set anlaysis expression. I had originally try to include it in a varilable but that was causing problems. My current expression using the variable is below:
I need to figure out how to get the second part of code into the set analysis expression without using a variable. Any help would be greatly appreciated. Thank you!