Unlock a world of possibilities! Login now and discover the exclusive benefits awaiting you.
Hi!
I’m trying to set up a “Graphic Chart” which displays the input and output of requirements.
The expression is the following: “count(Req)”
The problem comes when I try to set the dimension.
Table “Requirements” contains the following fields: “Date_Input” and “Date_Output”.
I cannot display both Dimensions on the chart, I just want an unique Dimension above time. The purpose of the graphic is to show input and output of requirements above time.
Is there any way I can do this? Master Calendar? How do I set it up?
Not sure if I’m being clear enough, hope to get a solution to this.
Thx in advance!
Julian.
PS: Working on QV10.
You can either use a master calendar with a link table or a calendar as data island.
There are many threads here in the forum covering both approaches, just search for master calendar, link table, multiple dates etc.