Attached here Excel report I created from our ERP system using QlikView.
This report contains production reports per shift.
The ERP system does not manage shifts therefore the shift calculations should be done in Qlikview.
I tried to produce the desired report (as seen in the attached Excel file) in one calculation using Aggr function,
but I get only empty cell.
Does some one have an idea how to solve this problem (in one shot not without creating another table)?