Unlock a world of possibilities! Login now and discover the exclusive benefits awaiting you.
An issue with the calendar
We are having a a look at the attachments
nly 2012 to 2014 but in server its showing . Can help me resolving this issue
Thanks in advance
Hi John,
There is probably a difference in the load script of youre calendar between the test server and production server. Can you provide more information on the Calendar load script? How do you define the calendar years? Are these based on variables or data driven?
It's almost impossible to tell just from the screen shots. Your calendar is probably created in a load script, based on some fact dates of your input data. I assume these data differ in test and production environment.
May be thats how the data is between the two environments. Please check the data at the extract layer. I would assume they would be different.