Hi,
I have a set of sessions all with associated activities - some have timings (completed), some do not (to be completed).
I want to be able to select a number of uncompleted sessions, have them displayed in a table with their respective activity and projected average timings based on completed session timings.
The problem is that when I select an uncompleted session, it calculates an average based on the timings available for those sessions (i.e. all zero). If I set an expression to calculate timings ignoring session, it displays values for all sessions.
I though this expression would work, but it doesn't:
=avg(TOTAL <activity> {<session=>}time)
I'm sure there's a way to do this set analysis, but I'm struggling.
Can anyone suggest anything?
Thanks in advance.
Tom
I suggest you post an example document with some data.
Hi Gysbert,
I've attached a document with dummy data in the format I have mine - I'm trying to make it so that when you select session D or E in the projected table (complete_flag=0), you should get an average timing for each activity based on timings that actually exist (complete_flag=1).
See attached example for some suggestions. Possibly not what you actually want. Perhaps you can add a result table with the numbers you expect as results.