I want to bring in a variable from a QlikView document which is in the QEMC which is a scheduled task. I want to then use this variable in the email alert and notifying bodies.
Can this be done?
For example I have a variable vWeek = 201409 in the QlikView document as a variable created in the script.
I want to be able to include that value in the email body.