On this date, we have a line of work 'L103', two shifts 'A and B' and two products.
The shift A did two products '03742 and 03491' and the shift B did one product '03491'.
The table shows the units produced (Units), the time used (Time), the nominal objective for each product (Nominal) and the available time of the line (avaliable time).
The table shows a efficiency (efficiency=yield), result of a formula which I explain below: