Hi,
I have an execution plan named "Incremental_Load", in this plan I have 3 jobs (Job1, job2 and job3).
I want to put hold on job2. i.e. when I run "Incremental_Load", only job1, job3 should get executed. Job2 should not get executed.
Please let me know how can i do this in TAC.
I have already scheduled all the jobs in execution plan as parallel execution. Due to an issue with 1 job, I want to place hold on that job.
Eg: I do not want that job to be executed at all whether previous job is succesful or in errored(as I am not sure whether remaining jobs will be successful or failures).
Thanks,
Durga Devi
I am looking at an option like in Informatica, we can place job on "Hold".
I have created an execution plan(named as "EP") as timebased trigger. In that i have 3 tasks as parallel execution. I am facing issue with 1 job daily.
Eg: EP will trigger daily at 23:00 PST. When this triggers all the tasks in this execution plan will start execution. My requirement is I do not want 1 job to be executed whether previous jobs are success or failure. In this case what needs to be done?
Is removing job from Execution Plan the only alternative? If we are removing task from exeuction plan. then after few days if we want to that task(job2) as well then manually we need to create another task in the execution plan? is this correct?
Hi
Yes, you have to remove the task (job2) from the execution plan, because there is no dependency between them. Add another execution plan for task(job2) if needed or just schedule the job2 in Job Conductor.
Regards
Shong