Unlock a world of possibilities! Login now and discover the exclusive benefits awaiting you.
Hi Everyone!
I have an enviornment with 4 apps (appA, appB, appC and appD) and two nodes (Central and RIM Node).
Everyday I reload the four apps automatically (Reload Tasks), but I want to reload appA with the RIM Node and the apps appB,C and D with the Central Node.
Is it possible? Because I only see the option of do all the reloads with the RIM Node but don't see the option of do only the reload of one task/app.
Thanks!
You can do that with load balancing rules, but only if you have two or more rim nodes. Otherwise the central node is always included in the load balancing mechanism.