Hi,
I am taking over an ETL job that is moving data from Oracle to HPE Vertica in Talend 6.3.1 free edition. In this job there are about 12 different tables being moved. The vertica cluster has 4 nodes and can easily handle parallel processing. When I kick off the talend job to load the 12 tables, I see that the job is executing the tOracleInput task one table at a time. Can anyone tell me if there is a way I can kick off all 12 tasks at the same time? I'm fairly new to Talend and I can't seem to find anything in the talend forum that tell me how to do this. Thanks.