Skip to main content
Announcements
Introducing Qlik Answers: A plug-and-play, Generative AI powered RAG solution. READ ALL ABOUT IT!
cancel
Showing results for 
Search instead for 
Did you mean: 
varma8998
Contributor III
Contributor III

How to remove the auto calendar in the data Manager

Hi All,

While loading the script in the data load editor I did not got any error after that in the data manager if we click on load data I am getting the below error

Data was not loaded because of errors in the script. Please correct the script in the data load editor and reload data

Than I checked in the data load editor there [autoCalendar] script is generated because of that data is not laoded

Thanks & regards

Shiva

1 Reply
Ivan_Bozov
Luminary
Luminary

The autoCalendar should not be a problem unless you have two autoCalendars in the script. This happens when you unlock the script and then add data with date fields using the data manager. Then Qlik adds a second autoCalendar and there is a Duplicate Derived Field error.

Make sure there is only one calendar. Otherwise the error is caused by something else.

vizmind.eu