Skip to main content
Announcements
Introducing Qlik Answers: A plug-and-play, Generative AI powered RAG solution. READ ALL ABOUT IT!
cancel
Showing results for 
Search instead for 
Did you mean: 
BhaminiParmar12
Contributor III
Contributor III

Please Help me with my Below requirement

Hi Everyone, There is a requirement, adding a KPI with last data reloaded KPI vs new Data reloaded KPI , For Example - Latest Reloaded KPI is - 566,833 and if we refresh KPI changed to 600,600 it should give both last reloaded vs new reloaded KPI

1 Reply
shyambutani
Contributor II
Contributor II

Hello Bhamini,

For this you will have to store the data as a snapshot. Below are the steps:

1. Add a store statement in the script to store the data in QVD.

2. Add logic to read the data from this QVD in the script. So, Now in the data model will have current reloads data as well as previous reloads data. 

3. You can use this in front end to design your KPI or visualization. 

Keep in mind the granularity of the data you want to store. 

 

Thanks,

Shyam