Hi group
Is there a limit to the number of "nsq" files that can be loaded into the NPrinting Server??
Reason I ask, we have two job running daily, but when I add a 3rd, they don't run.
I have attached screen shots of what the scheduler looks like when only 2 jobs running with the log file of the server.
I have attached screen shots of what the scheduler look like when 3 jobs are running with the server log file.
I can open designer on the server and manually run all 3 jobs without issue, its just the scheduler is not kicking off.
Any advice/ideas would be great.
Thanks in advance
Brett
hi
there is no limit i am aware of and for sure it isn't 3 files
i have had installation with close to 20 files running parallel
is the new job starts at the same time as other jobs ?
what kind of job those the new file need to perform?
if you create another nsq file with a simple job those the same happens?