Unlock a world of possibilities! Login now and discover the exclusive benefits awaiting you.
Hi,
I am unable to figure out a subtotal formula for the below structured pivot table
Dim 1 Dim 2 Metric 1 Metric 2 expression/Metric 3
Q1 NA 10 20 Metric 2/Subtotal of Metric 2 = 20/50 = 40%
Q1 1-100 10 30 30/50 = 60%
Subtotal-------------------------- 10+10 20+30
Q2 1-100 20 20
I am unable to calculate the expression 3/metric 3 in the pivot table.........please let me know
Please find the attached excel to see what problem I am facing
Thanks,
Harsha
A solution is attached.
A solution is attached.
Good morning, could put the solution in the message body , I am using the free edition, thanks.