Unlock a world of possibilities! Login now and discover the exclusive benefits awaiting you.
Can anyone advise us, how to build the chart we want. We have put in a picture how we would like the chart to look like, but we are not able yet.
Hope to hear from you.
Hi Heide220,
I adjusted your example and have it working (see attachment).
In order to be able to present it in the right format I removed the date from your start/finish fields. If these are timestamps you should exclude the date and if appropriate include as a seperate field.
The axes have a static maximum of 1.1 and in the expression I included a bar offset. I assumed that you wanted to see the same color for each machine instead of for each task. If not you should remove the color formula in the duration expression.
I hope this gets you going!
Hi there,
First of all you need to set time as Dimension containing all possible Time Values (00:00-24:00).
Since your start and finish column include date u'll get a problem here.
I would simply put your dates in a seperate column to get your connection more easily.
After that it should work.
Hi Heide220,
I adjusted your example and have it working (see attachment).
In order to be able to present it in the right format I removed the date from your start/finish fields. If these are timestamps you should exclude the date and if appropriate include as a seperate field.
The axes have a static maximum of 1.1 and in the expression I included a bar offset. I assumed that you wanted to see the same color for each machine instead of for each task. If not you should remove the color formula in the duration expression.
I hope this gets you going!
Hello Mark,
Many thanks for the example this will definitly help solve our problem.
Greatings Mireille