And i have a measure (Different) that looks like this and is based on the last three months (In month 8 it is month 5-7):
I want to get the different (based on last three months, 90.16%) and multiply it with last year number on the same month and make expected numbers on the months thats i left this year. I want to have this table when im done:
Anyone that can help how im doing that?
When im trying i only get expected numbers on month 5-7.