Not applicable

Operations monitor reload task failed (from QMC)

Hi guys.

I seem to be having a problem with reloading the operation's monitor on QMC.

However, i am able to reload the license monitor.

(View the .log file for the reloading of operations monitor as attached !.)

I am using virtual proxy with one node.

I have appended the prefix of the virtual proxy to the URL of the data connections (qrs_*) but to no avail.

I have set the reload user as root admin and these includes Sa repository and Sa scheduler.

Do note that i have read and tried these solutions.

Monitoring a Qlik Sense site ‒ Qlik Sense (Updating data connections due to prefix of virtual proxy).

Setting reload user, sa repository and scheduler to root admin.

Import and replace operations monitor on the monitoring stream.

Thanks all, appreciate your help.

1 Solution

Accepted Solutions
Anonymous
Not applicable
Author

Apologies. I have solved the issue by changing the following settings in the IIS server:

1. Add service account to Administrators group (Server Manager)

2. Change service account for all Qlik Sense engine service to the user account running the Qlik Sense server

Thanks !

View solution in original post

2 Replies
steeramp
Partner - Creator II
Partner - Creator II

I have solved the issue with - edit all qrs_* connection change https to http.

I use domain SSL cert to verify https connection for my domain users. And REST connector don't like this.

Anonymous
Not applicable
Author

Apologies. I have solved the issue by changing the following settings in the IIS server:

1. Add service account to Administrators group (Server Manager)

2. Change service account for all Qlik Sense engine service to the user account running the Qlik Sense server

Thanks !