Skip to main content
Announcements
Qlik Connect 2025: 3 days of full immersion in data, analytics, and AI. May 13-15 | Orlando, FL: Learn More
cancel
Showing results for 
Search instead for 
Did you mean: 
TusharDev_Qlik
Creator II
Creator II

QlikSense Nov 2021 Upgrade successful on Central but failed on RIM

We are upgrading QlikSense from Nov 2020 SR9 to QS Nov 2021 SR5. Upgrade on the central is successful but the RIM node upgrade failed. As per Upgrade guidelines on Multi node deployment 

 

When upgrading a rim node, ensure that you use the same log-in account as was used for the initial installation of that node. Failure to do so means that the central node will not find the certificates installed on the node and you will need to perform a clean installation of the node.

We are not sure which account was used for the initial installation. How can we find out that?

Labels (1)
1 Solution

Accepted Solutions
Albert_Candelario

Hello @TusharDev_Qlik,

Thanks for posting.

If the affected node is the RIM one, you could simply uninstall it and do a fresh install, sometimes you might need to uninstall the patches manually from the control panel before the major version of Qlik Sense can be properly uninstall.

I hope this helps you!

Cheers,

Albert

Please, remember to mark the thread as solved once getting the correct answer

View solution in original post

4 Replies
rohitk1609
Master
Master

You should share more information for investigation, Repo logs or setup failed logs. Its hard to say what exactly the reason without checking the logs.

Albert_Candelario

Hello @TusharDev_Qlik,

Thanks for posting.

If the affected node is the RIM one, you could simply uninstall it and do a fresh install, sometimes you might need to uninstall the patches manually from the control panel before the major version of Qlik Sense can be properly uninstall.

I hope this helps you!

Cheers,

Albert

Please, remember to mark the thread as solved once getting the correct answer
TusharDev_Qlik
Creator II
Creator II
Author

@rohitk1609 @Albert_Candelario ,

Do we need to keep the Central server Qlik services up and running when we upgrade RIM nodes?

We tried to upgrade RIM node keeping Qliksense Repository Database(QRD) service running on the central and we did not face any issues.

Albert_Candelario

Hello @TusharDev_Qlik ,

As per the documentation the services should be stopped. 

I am glad you could upgrade as desired!

Cheers,

Albert

Please, remember to mark the thread as solved once getting the correct answer