Unlock a world of possibilities! Login now and discover the exclusive benefits awaiting you.
Hi everyone,
I'm adding a new table (Production) to a report and it has to be linked to other two tables as shown below (red arrows).
The DateLink table was created in order to reach the two data fields in the table Controls with only one date field (in the Calendar table).
This is obiuvsly causing me a looping error. How can I avoid it?
Thanks!
change Date column in DateLink or Production to other name.
Load
Date as DateProduction,
City,
Product
resident x;
My issue is not the name of the fields, is what I want to achieve...
I need the Produtcion table connected to the Calendar table and also to the Products table...