Hi community
I'am facing an issue with this attached app
This app use an ODBC connexion to loop thru excel sheet.
Those excel sheet have all the same structure and header and are named by week ( Eg S1 to S43) , by quarter ( Eg T1 to T4) and by month ( janvier fevrier mars)
So a made three script to load tables
one by week adding the name of the sheet as a dimension "Week" and it works well (table MyTableSem)
One by quarter adding the name of the sheet as a dimension "Quarter" and it works well also (table MyTableTri)
Then i wanted to do the same with month sheet
It's seems to load until the month of August ( Aout in french)
but i have this message error in the script editor :
I tried to copy past the Aout sheet data to another sheet then renamed it as aout but i have the same error message.
Of course the sheet named "aout" is existing in the excel workbook.
attached is my qvf app
If someone could have a glance and solve my problem it would be very great.
Thanks in advance
Hi Bruno,
Change this:
LOAD
$(MoisNb) as "Mois",
To this:
LOAD
'$(MoisNb)' as "Mois", // Note the single quotes that defines a string
Hi Bruno,
Change this:
LOAD
$(MoisNb) as "Mois",
To this:
LOAD
'$(MoisNb)' as "Mois", // Note the single quotes that defines a string
Hi Bruno,
the issue is with the field named août.
Try enclosing the field name août in square brackets [] or double quotes
e.g.
LOAD
[août] as "Mois"
Marcus
Hi Ruben,
Thank you so much,
I don't know why nor how but it works perfectly.
Can I ask you something more about my Month dim :
I Add this in the script to convert it as month dimension to get the value in right order and not alphatebical order
month(date#('$(MoisNb)','MMM')) as "Mois",
but it does'nt load the sheet "mai"
I think it's because of this in my script :
if(len(sheetName))>3 then
load ...
I Use this to take only sheet name different from S1 to SXX and sheet name different from T1 ou T4
but it cause a missing load with mai in my month calendar.
Do you see another way to excluse weeks en quarter sheets ?
Once again thank you very much for rapid answer
Bruno
Hi Marcus,
thanks for advise, Ruben give me the solution.
Bruno