What is Control Chart?

The control chart is a statistical analysis used to study how a process changes over time. Data are plotted in time order. Control charts are used to routinely monitor quality or simply you can say, control chart is process improvement technique.

There are many types of control charts, but we will focus on the basic control chart using the standard deviation method to understand the concept.

The following are some scenarios where control charts can be applied:

  1. In manufacturing, to test whether machinery is producing products within specifications.

  2. If you want to reduce the time it takes to admit a patient to the hospital.

  3. To analyze how the number of views is increasing or decreasing for a particular website.

 

Components of Control Chat

1) Avg line

2) UCL (Upper Control line) = Avg Value + Std Deviation* Std Dev Multiplier

3) LCL (Lower control line) = Avg Value - Std Deviation* Std Dev Multiplier

So, basically we can see which are the points "Out of Control" or "In Control".

You can control your Std Dev multiplier using variable.

 

How to Create a Control Chart:

  1. Create a Combo Chart.

  2. Select a Time Dimension: Choose a time dimension that suits your analysis; for this example, I have selected MonthYear. Also, ensure that it is set to continuous in the axis settings.

  3. Create Two Expressions: Create one expression for the line and another for the symbol.                              

    Kushal_Chawda_1-1727290724687.png

     

  4. Create expressions for the average line, Upper Control Limit (UCL), and Lower Control Limit (LCL), which will be used as reference lines in the chart. To set these reference lines, go to Chart Properties and navigate to the Presentation section.  

    Kushal_Chawda_2-1727290772273.png

     

  5. Create the Background color setting for the Symbol expression

         if( sum(Sales) < vUCL and sum(Sales) > vLCL, LightGreen(), LightRed())

 

Finally, the chart will appear as shown below

 

 

 

Please refer to the below link for further details

QlikView Control (SPC) Chart

 

Additionally, please see:

Benford's law

Bollinger Bands

Tags (1)
Comments
aniketsr
Creator
Creator

Good one Kushal.

manojkulkarni
Partner - Specialist II
Partner - Specialist II

Good information. Thanks for sharing

MK_QSL
MVP
MVP

TFS Kushal

ecolomer
Master II
Master II

Good work,

Thank's for sharing

Saludos,

Enrique Colomer

johnmackintosh
Contributor III
Contributor III

Be sure to use the correct calculation for standard deviation.

It won't be correct if you use the 'regular 'standard deviation (also applies to Excel etc).

0 Likes
ahaahaaha
Partner - Master
Partner - Master

Thank you for the interesting information.

0 Likes
Not applicable

good work Mr. Kushal.

really nice.

Thanks for such info.

Not applicable

Good Work Kushal.

Keep sharing such great stuff

0 Likes
terrusie
Contributor II
Contributor II

Hello Kushal,

I've noticed that the scope of the color expression, unfortunately, does not match the dimension of the chart.  For example, what if the dimension was a grouping of work orders,  the expression was the sum of all hours logged to that work order, and the work orders were sorted by latest timestamp in each work order.  When you go to set the color expression, the scope of the color is not specific to the work order.


To make this analogous to your example, imagine if your Sales data were individual sales timestamped at the date of transaction, rather than grouped by month, and your dimension was something like month(date).  When you went to get the color, this dimensional scope would be lost, and sum(Sales) would return the sum of all sales rather than just those for that month.

My assumption is that your individual Sales data are already grouped by month.

Is there a workaround for this?

0 Likes
joe_warbington
Luminary Alumni
Luminary Alumni

We held an on-demand session with National Health Services (NHS) about how they built and leverage Statistical Process Control Charts (SPC) and Run Charts in QlikView and Qlik Sense. johnmackintosh‌ covers these topics in depth:

  • Variation and importance in Quality Improvement (QI) projects within healthcare
  • The Run Chart
  • Run Chart Rules
  • Simple QlikView run chart
  • (Statistical) Process Control (SPC)
  • ‘I’ ‘P’ ‘C’ ‘U’  - Examples
  • Rare events / time between

 

Be sure to check this out: https://youtu.be/OVkUOTA-GQw

0 Likes
Version history
Last update:
‎2024-09-25 03:27 PM
Updated by: