Unlock a world of possibilities! Login now and discover the exclusive benefits awaiting you.
Hi Techie,
I have upgraded Qlik site from April 2018 to June 2018, after that my reloads are getting failed scheduler node. I am writing down my inputs which can help to find the root cause:
1. firewall is down on central node and rim node.
2. Symantec anti virus is installed on same day of upgrade.
On scheduler node,logs states below error:
Exception encountered when fetching app migration hash, still trying. Failed attempts: 64130 No connection could be made because the target machine actively refused it 10.XX.XX.XX:4545↵↓Unable to connect to the remote server
I have checked on rim node, port 4545 is getting utilized by node.exe service which we installed to host web page.
If I make central node a master and slave my reloads work fine and when I make it Master only all task get failed.
Please help to find out the root cause.
Thanks,
Rohit
I think you mean June 18 to Abril 18? Or you downgraded? Anyways, I guess that error you got it from the repository logs, that normally means that something is wrong with the engine or the migration service, I would try to restart the engine and dispatcher service, and see if that error gets clear. Without engine, the scheduler won't be able to execute/reload tasks.
BR
Gio