Unlock a world of possibilities! Login now and discover the exclusive benefits awaiting you.
Hi,
I have 4 columns (the Euro values below) and I take the sum from everyone of them
that's my formula in the diagram settings: sum(column1) + sum(column2)+ Sum(column 3)+ Sum(column 4)
script:
load: KW,
...
From ...
load Euro Value1,
Euro Value2,
Euro Value3,
Euro Value4;
from ...
the result is the green line from the picture.
but I want the steps in the line from every sum like the brown line in the picture (Graph2)
background:
I have several Projects and every projekt has several lines
Euro value1 Euro value2 Euro value3 Euro value4 calendar weeks
project3 20€ 63€ . . 25
project1 52€ 40€
project2 29€ 87€
project3 20€ 14€
.
.
the values in the X-axis are the calendar weeks but the Euro values shouldn't be only in the calendar weeks they are in the line
for example the first line with project1 should show a line with the value 10€ from calendar week 1 - 13 and not a point on the calendar week 2
the problem is, if I don't load the calendar weeks, the other lines doesn't fit, so I have to load the column.
If I load al datas in one load order I get the green line from the picture (Graph)
Have anyone a idea how to do it?
thanks
When using the 1 as the Set Identifier you start your set analysis from the full dataset, regardless of selection.
Using $ instead respects current selections in fields.
Also, that is a massive expression
I build this result
sum({1<KW = {1,2,3,4,5,6,7,8,9,10,11,12,13}>} [FL-LB Plan / EL Plan Q1]) &
sum({1< KW ={14,15,16,17,18,19,20,21,22,23,24,25,26}>} [FL-LB Plan / EL Plan Q2]+[FL-LB Plan / EL Plan Q1] )&
sum({1< KW ={27,28,29,30,31,32,33,34,35,36,37,38,39}>} [FL-LB Plan / EL Plan Q3]+[FL-LB Plan / EL Plan Q2]+[FL-LB Plan / EL Plan Q1]) &
sum({1< KW ={40,41,42,43,44,45,46,47,48,49,50,51,52,53}>} [FL-LB Plan / EL Plan Q4]+[FL-LB Plan / EL Plan Q3]+[FL-LB Plan / EL Plan Q2]+[FL-LB Plan / EL Plan Q1]
)
If nothing is selected, everything is fine, but if I select a project the line doesn't change the values.
Is it possible to say
if a project selected, than take sum of it??
When using the 1 as the Set Identifier you start your set analysis from the full dataset, regardless of selection.
Using $ instead respects current selections in fields.
Also, that is a massive expression
thanks Johannes, that was it
I know, but I hadn't any other ideas to solve my problem