Refresh schedule less than 1 minute

Hi all,

Is there a way to set the refresh schedule in QMC to less than 1 minute intervals? e.g. 30 seconds.

1 Solution

Accepted Solutions
Partner
Partner

Hi Sifat,

it's true: you can't schedule a task via QMC less than a minute (if you try, you'll get an alert that notice that a positive integer number is required).

You could consider two ways:

1. scheduling with "Continuosly" option --> use it with attention because - depending from the type of data you have to reload - it could impact in server performances;

2. reload using qlikview.exe in a windows task.

Let us know.

S.

View solution in original post

3 Replies
Partner
Partner

Specialist
Specialist

Hi Simone, I'm actually looking to set the refresh schedule on the QMC/publisher, not the database. Is it possible? (I don't know what the QMC looks like - the QMC admin has told me he can't reduce it to less than 1 minute).

Partner
Partner

Hi Sifat,

it's true: you can't schedule a task via QMC less than a minute (if you try, you'll get an alert that notice that a positive integer number is required).

You could consider two ways:

1. scheduling with "Continuosly" option --> use it with attention because - depending from the type of data you have to reload - it could impact in server performances;

2. reload using qlikview.exe in a windows task.

Let us know.

S.